Engineering development (design and simulation) of the loading table, double robot manipulator, and modification of the current buffer.
The project for Magna Autotek consists of the design and simulation of an engineering change, focusing on ensuring precision and efficiency in its implementation. This process includes key activities such as reviewing and defining the layout, analyzing mathematical models, and validating GD&T specifications to define clamping areas.
The project aims to develop an efficient design and simulation for an engineering change, optimizing key processes and ensuring correct implementation at Magna Autotek within the established timeline and budget.
Magna Autotek
Design and simulation of engineering change
October 2024
November 2024
$826 MDP
Magna Autotek
Mechanical, hydraulic, and electrical installation of manufacturing cells.
This project aims to install and commission key systems in an industrial environment, including the wiring of electrical equipment, the installation of safety systems, and the piping for process lines.
The project focuses on the integration of industrial infrastructures, covering the installation of electrical and communication equipment, as well as the implementation of safety and control systems to improve the efficiency and safety of the workspace.
Paslin
Mechanical, hydraulic, and electrical installation of manufacturing cells
June 2023
January 2024
$35 MDP
Magna Autotek, Toluca
Commissioning and programming of Fanuc Robots.
Loading and validation of OLP (offline program), adjustment of UF (User Frame) and UT (User Tool), trajectory validation, collision zone validation, seal and Coherix calibration, DCS configuration, empty test, adjustments to achieve cycle time, automatic run without failures, Burst Build events, BuyOff by FFT and the client.
The development of programming under the RIVIAN standard. Robot programmers with excellent knowledge and experience in Fanuc robots and the RIVIAN standard, aiming to program 31 Fanuc robots; the commissioning was done at FFT Mexico (Puebla, Puebla) and the final installation at the client’s Rivian plant (Normal, Illinois).
FFT USA / RIVIAN
Robot Commissioning
24/10/23
30/06/24
$6 MDP
Puebla, Puebla / Mexico - Normal, Illinois / USA
Software design, commissioning, and production line optimization.
This project included two production lines with more than 200 welding and material-handling robots, presenting the challenge of designing software to flexibly produce over 15 chassis models continuously.
Adapted to meet the production demands of the automotive industry, this project was executed continuously over 18 months. It involved software development for automation equipment and communication interfaces between operators and workstations.
The commissioning and cycle time optimization processes were carried out during different stages of the project to ensure the complete delivery of equipment at the final plant facilities in Guanajuato, Mexico.
This project posed a significant challenge in automation, ensuring product traceability throughout the production line, process reliability at each station, and the flexibility to produce all existing models with minimal model changeover time.
Metalsa
Software design and commissioning
August 2022
March 2024
15 MDP
Saltillo, Coah. / Guanajuato, Mexico